THE MAP OF INVESTMENT (NICHEUS) PROJECTS IN THE REGION

List of projects of the information-monitoring system "Follow-up".

The name of the project

Foreign investor

The

country

The cost of the pro-

ject, USD mil-lion

Start date of construction (quarter / year)

Date en-tered

Current status

1.

Construc-

tion of the KAMAZ Service Center

Party of the Republic of Kazakhstan: Partner's Party: KAMAZ Trading Company LLP

Russia

6,5

Q1 2018

Q4 2018

In 2018, design work was carried out.  The planned volume of invest-ments are about KZT2.1 bn., which, in 2017, more than KZT130

m. was spent for preparation of design estimates and construc-tion works on the first quarter of 2018.

2

Construc-tion of

a pharma-ceutical factory

Party of the Republic of Kazakhstan: LLP ”Lumpan Caspian Pharmaceu-ticals LLP”.

Side of partner: Sava Healthcare

 

Singapore

50

Q4 2015

Q3 2019

Construc-

tion and installation work is under way. Completed the erection of columns 1, 2 floors. Preparation of the frame of the columns of the third floor is in progress.

3

Construc-tion of an integrated gas chemical complex - Phase 1 (production of poly-propylene)

Party of the Republic of Kazakhstan:

 

LLP "KPI Inc." (OXK LLP + Firma ALMEX PLUS LLP)

 

Partner's side:

 

CNCEC (General Contractor)

PRC

2630

Q2 2018

Q2 2021

On September 12, 2017, the Supp-lementary Agreement to the EPC contract was signed. On October 25, 2017, the head office of ICBC Bank approved the CNCEC credit line for issuance of a guarantee for advance payment. On November 24, 2017, the first payment on credit lines was written off in the amount of $ 409 million.

 

The necessary external infra-structure for construc-tion (access roads and railroads, railway station, power lines, etc.) has been built.

 

NWF Samruk-Kazyna provided a guarantee in favor of the State Develop-ment Bank of China for

$ 2,000 million. The EPC contract with CNCEC was signed in December 2015. To- day, the project has been mobilized by the general contrac-tor's team, detailed engi-neering is being carried out. Also works on definition of the list of the equipment of long term of manu-facturing for realization of the order are begun. The beginning of construction works is scheduled for the 2nd quarter of 2018.

4

Produc-tion of Catalytic Cracking Catalysts

The Republic of Kazakhstan: OHCH LLP (12.5%), KMHPM (12.5%)

USA

200

Q2 2018

Q2 2021

In January of this year, between KMG, OHC and Grace signed the charter of the joint venture within the frame-work of

N. Nazarbayev's visit to the United States.

 

Currently, work is underway to establish a joint venture with the following distribution of shares: 12.5% -KMG, 12.5% -OHK and 75% -Grace. An application for consent to economic concentra-tion in the KREMK was sent.

5

Produc-tion of cyclohe-xane

Party of the RK: KazHimProdukt LLP Partner's side: Vitol

Netherlands

66

 

 

The enterprise was registered as a participant of the FEZ "NINT". To date, the land is being registered, as well as the coordi-nation of railway schemes and engi-neering networks.

6

Construc-tion of a plant for the produc-tion of a power cable on a carbon basis

Side of partner: Tokyo Rope

Japan

100

2019

2021

On September 6, 2017, the delegation of Tokyo Rope, headed by the company's chief engineer Takahiro Okayama, arrived in Atyrau for talks with the region's leadership. There is a pre-liminary agreement with the city akimat on the allocation of a land plot of 2 hectares. And also the volume of purchase of composite cables for the needs of the region was worked out. Raw materials for the implemen-

tation of the project for the produc-

tion of corbel cables were found in Tatarstan. At the moment, samples of raw materials were sent to the test in Japan. If the expertise is positive, the company is ready to make a positive decision on construc-tion in Kazakhstan

7

The creation of a gas chemical complex for the process-sing of natural gas (methanol-ammonia)

Party of the RK: OXK LLP

 

Partner Party: NORINCO

PRC

1 500,00

2020

2024

 

In December 2017, NORINCO representatives arrived in Atyrau region to visit the SEZ NINT. At the moment, a business plan was drawn up and sent to the UCC for review and approval.

8

Organiza

tion of petrochemical produc

tion on the basis of raw materials from Karacha

ganak and Kashagan deposits (produ

ction of polyethy

lene) KLPE

Party of the Republic of Kazakhstan: United Chemical Company LLP

 

Partner's side:

 

Borealis AG, Mubadala Investment Company

United Arab Emirates, Austria

6500

II-III quarter of 2020

Q3 2025

A Memoran

dum was concluded between LLP United Chemical Company, Mubadala Investment Company and Borealis (Australia), which provides for the develop

ment of a feasibility study for the project. In June-September 2017, the Ministry of Energy and Samruk-Kazyna JSC held a series of negotiations with Borealis, at which technical and economic details of the project were discussed. On September 19, 2017, the Board of Directors of Borealis decided to participate in the project with certain conditions. The terms of Borealis are reflected in the Memoran

dum on the main terms of cooperation between the Govern

ment of the Republic of Kazakhstan and Borealis on the polyethy

lene production project, which is planned for late March 2018. On February 28, 2018, the Board of Directors of Borealis approved the transition to the next stage - the creation of a joint company for the develop

ment of a feasibility study.

The list of investment projects with the participation of domestic investors (above 1 billion tenge) in the context of regions - 180 projects for a total of 2.45 trillion. tenge

The name of the project

Investor

Industry

Amount, mln. Tenge

Start date of construction

Project launch date

1

Construction of flour mill

Karat LLP

Agribusiness

4500

Q3 2017

Q1 2018

2

The organization of production for the application of corrosion-resistant protective coatings of metal by hot dip galvanizing

Atyrau Neftemash LLP

 

Mechanical engineering

2611

Q3 2017

4Q 2018

3

Construction of a gas turbine power station

"Karabatan Utility Solutions" LLP

RES

106  774

Q3 2016

Q4 2018

4

Construction and modernization of the complex for the provision of services for the preparation of rail transport for filling oil products

Batys Petroleum LLP

transport and logistic

4290

Q2 2017

Q4 2018

5

Factory for the production of ready-mixed concrete

New Ascent LLP

Construction industry

1300

Q1 2018

Q1 2018

Projects for which documentation is developed

6

Construction of a broiler house

Meken Chicken LLP

Agribusiness

5073

Q3 2018

Q4 2019

The list of investment projects with the participation of domestic investors (above 1 billion tenge) in the context of regions - 180 projects for a total of 2.45 trillion. tenge

The name of the project

Investor

Industry

Amount, mln. Tenge

Start date of construction

Project launch date

1

Construction of flour mill

Karat LLP

Agribusiness

4500

Q3 2017

Q1 2018

2

The organization of production for the application of corrosion-resistant protective coatings of metal by hot dip galvanizing

Atyrau Neftemash LLP

 

Mechanical engineering

2611

Q3 2017

4Q 2018

3

Construction of a gas turbine power station

"Karabatan Utility Solutions" LLP

RES

106  774

Q3 2016

Q4 2018

4

Construction and modernization of the complex for the provision of services for the preparation of rail transport for filling oil products

Batys Petroleum LLP

transport and logistic

4290

Q2 2017

Q4 2018

5

Factory for the production of ready-mixed concrete

New Ascent LLP

Construction industry

1300

Q1 2018

Q1 2018

Projects for which documentation is developed

6

Construction of a broiler house

Meken Chicken LLP

Agribusiness

5073

Q3 2018

Q4 2019


Date of publication: 11.04.2018 06:20